ELSEWEDY ELECTRIC been entrusted by the Saudi Electricity Company (SEC) for the construction of a new 110/33/13.8 kV substation for the National Aquaculture Group (NAQUA) in Allith City, located180 km south of Jeddah.
The scope of work includes the construction of a revolutionary substation, featuring 12 bays of 110 GIS, two 110/33 kV (80/100 MVA) power transformers, two 110/13.8 kV (50/67 MVA) power transformers, LV SWGR, protection & control systems, SAS, and a comprehensive telecommunication system. Additionally, we will be installing capacitor banks, bulk materials, and carrying out civil works, HVAC, and firefighting system installations